Cedar double swing gate with operators in Mill Plain, WA

Photos, start to finish

Photo 1 of 5

  1. Crew mixing concrete and setting gate posts in a side yard in Mill Plain, Vancouver WA
    01In progress Day one: mixing concrete and setting the posts.
  2. Cedar double swing gate leaves in black steel frames hung on new posts while the crew finishes footings
    02In progress Same afternoon: both cedar leaves hung in their steel frames.
  3. Cedar double swing gate with black steel frame installed, ground still open for wiring
    03In progress Three days later: gate hung and trimmed, ground open for the wiring.
  4. Swing gate operators mounted across a cedar double gate with a control box on the house wall
    04In progress Operators mounted on both leaves, control box on the wall.
  5. Finished automatic cedar double swing gate with black steel frame and new concrete in Mill Plain, Washington
    05Finished Finished: automatic cedar double swing gate, with concrete poured in front.

Swipe, or use the arrows, to go step by step.

The job, start to finish

Where it started

The opening sits in a side yard, between the house and the neighboring fence. We started from the ground: digging, mixing concrete, and setting the posts.

What we did

Both leaves went up the same afternoon: cedar boards inside black steel frames, with arched tops and a narrow fixed panel on each side. A few days later we opened the ground for the wiring, mounted a LiftMaster swing operator on each leaf, and put the control box on the wall.

  • New posts set in concrete
  • Two cedar-filled black steel gate leaves
  • A swing operator on each leaf and a wall-mounted control box
  • Five days from first post to finished gate

How it turned out

Five days after the first post went in, the gate opens and closes on its operators, with fresh concrete poured in front of it.

See it working

Both leaves opening on their LiftMaster operators.

More on this kind of job: read our guides, Wood, steel, or aluminum gates and What a driveway gate costs.

Services on this job: Gate installation, Custom fabrication, Openers & automation. More about our work in Mill Plain.

Good to know

Questions we get about jobs like this

Does a custom gate change what opener I need?

Yes. Operators are rated by gate weight and length, so a heavy ornamental steel gate may push you past what a residential unit like a Mighty Mule or Chamberlain/Elite can handle, into a LiftMaster, Nice/Apollo, FAAC, or Viking sized for the load. For very heavy or high-cycle gates, hydraulic and industrial operators such as HySecurity are the right tool. We size the operator to the gate we're building, not the other way around.

How long does installation take?

Once your gate is fabricated, most residential installations take one to two days on site: setting posts, hanging the gate, mounting the operator, cutting loops, wiring, and programming access. Concrete footings need time to cure before the gate hangs on them, so some projects split into two short visits. Custom fabrication adds lead time up front, which we give you when we quote, and we stick to it.

What safety devices are required on an automatic gate?

The UL 325 standard requires monitored entrapment protection on every automated gate. In practice that means photo eyes across the opening, contact edge sensors on surfaces that could pinch, and an operator that reverses when it senses obstruction. We also install vehicle loops in the driveway: an exit loop that opens the gate for outgoing cars and a reversing loop that keeps it from closing on a vehicle in the path. These are not upsells. We treat them as part of every installation because a gate that can't sense a child or a car bumper should not be automated at all.

Get your free estimate

Picture this at your place? Call, or send the form. The estimate is free.

Call now